Environment Agency
Blandfords were pleased to be appointed to carry out electrical inspection and testing to installations located along our waterways covering the Nene, the Welland and the Glen. Working closely with the Environment Agency, Blandfords helped to maintain the agency’s high standards. Installations included electrically operated sluice gates, guaging stations and pumping stations, located in remote locations our engineers needed to use grid references to locate them. They only got lost once or twice!!