Project Description
EMS Truck and Trailer, Northampton
We were pleased to be awarded the project for both air conditioning and electrical installation works for the refurbishment of a warehouse in Northampton, carried out to the new tenants requirements. From our Kettering based offices, we were able to coordinate all aspects of the job including the health and safety requirements.
Mains and Sub Distribution
We carried out an upgrade to the distribution, including 2 No. new distribution boards to the warehouse complete with MCB/RCBO protection to accommodate new circuits and air conditioning supplies.
Lighting
We designed, installed and commissioned new energy efficient LED lighting and emergency lighting within the warehouse to suit the newly installed mezzanine floor and racking layout, and to offices as specified, complete with local switching for lighting and key switch test facility for emergency lighting.
Small Power
Our electricians carried out installation of small power to the office and warehouse. New dado trunking together with three phase supplies for warehouse equipment was installed.
Fire Alarm
Decommissioned and removed the existing manual fire alarm system and installed a new conventional fire detection system to cover both the warehouse and office area wired in FP200.
Data Installation
A complete new Cat6 infrastructure was installed throughout the building including all new cable management. A 42U data cabinet was supplied to accommodate the new data cabling and patch panels.
Air Conditioning
New energy efficient inverter split system air conditioning systems have been installed to the offices complete with LCD controllers.